Customer Stories
August 23, 2026

How Swizzels Uses Real-Time Data to Drive Continuous Improvement

60%+ reduction in downtime
Downtime on a critical asset fell from approximately eight hours per week to around two.
Real-time production visibility
Trusted data helps teams identify losses, prioritise improvement work and measure sustained impact.
More predictable production
Improved stability gives planning, operations and production teams greater confidence in schedules and forecasts.
Challenge

Swizzels had production data, but lacked complete visibility of performance across the manufacturing process. Finished-goods reporting and periodic line studies provided useful snapshots, yet they did not consistently show where losses occurred or which issues had the greatest effect on line performance.

As demand grew across key product lines, the Continuous Improvement team needed a clearer, more reliable view of downtime and production losses. Their goal was to improve stability, increase capacity and create greater confidence that production plans could be achieved consistently.

Solution

Swizzels selected Vorne XL for its straightforward implementation, user-friendly interface and ability to deliver meaningful production insight without the complexity of a large manufacturing software project.

XL gave the team real-time visibility of OEE, downtime and production losses. Rather than replacing established Continuous Improvement practices, it strengthened them: line studies, root-cause analysis and problem-solving workshops could now be guided by accurate, objective data.

The team used XL to identify the largest sources of downtime, create Pareto analysis of losses, prioritise improvement initiatives by impact and track performance over time. Operators were involved in defining downtime reasons and shaping how the system was used, helping build trust, ownership and engagement on the shop floor.

Results

Vorne XL helped Swizzels uncover a significant source of downtime on a critical piece of equipment. Investigation found that machine settings and adjustments varied between operators, creating inconsistent performance.

With clear evidence of the issue, Swizzels introduced a structured improvement programme focused on standardisation, equipment optimisation and process control. Downtime on the asset was reduced by more than 60%, falling from approximately eight hours per week to around two hours.

The business now has stronger production stability, more effective use of Continuous Improvement and engineering resources, and greater confidence in production planning and forecasting. Teams spend less time gathering information and more time solving the problems that matter.

‍

Download the full case study

‍

In this article
Book a Demo
Looking for performance improvements at your organization?​
Schedule a 30-minute product demo with expert Q&A.
Share this Post:
What Our Customers Say

The Results Speak for Themselves

From single sites to global networks, here's what happens when beverage plants stop guessing and start acting on the right data.

“The tool makes it much easier to understand what’s happening on the production line in real time. It’s very user-friendly, so both operators and leadership can quickly see performance and identify issues. It’s been a solid support in driving awareness and improvements across the line.”

Carlos Hurtado
Continuous Improvement Lead, Coca-Cola Southwest Beverages

“Before Lineview, we could not capture short stoppages. Now every stoppage is recorded automatically, giving us reliable data for analysis and decisions.”

Dominika Nowak
Performance & Digital Manager, Danone Europe

“It is not just the tool but the support around it that makes the difference.”

Helen Hume
Bottling Area Leader, William Grant & Sons

“This has helped us realise that we can improve beyond what was done decades ago. It has opened our eyes to areas that were in front of us the whole time, we just could not see them.”

Justin Koester
Senior Director of Factory Operations, Keurig Dr Pepper

“We wanted more than a vendor; we needed a strategic partner. Lineview had the enabling technology and deep operational expertise to support our transformation. Their team guided us through critical change management and helped us embrace new concepts to truly transform our business.”

Pavlos Sepetas
Operations & Technology Director, Vikos

“Applying Lineview to our lines, along with the support of the customer success team, has highlighted exactly where to pinpoint our efforts. We’ve really got to the heart of long-standing concerns and were able to mobilise the business with clear, unambiguous information.”

Tony Forrest
National Manufacturing Manager, Coca-Cola Europacific Partners